According to the relevant requirements of the "Environmental Protection Management Measures for Construction Projects in Zhejiang Province" (Order No. 364 of the Zhejiang Provincial People's Government), this project must carry out public disclosure during the implementation of the environmental impact assessment report, so that the public in the area that may be affected by the project construction can have an understanding of the project construction situation, and through information disclosure, understand the public's attitude and suggestions towards this project, and accept public supervision. The relevant content is now publicly announced as follows:
一、 Basic information of the construction project
Project Name: Production of 20000 tons of air drying self crosslinking water-based resin and 4000 tons of water-based coating annually
Construction unit: Shaoxing Changmu New Material Technology Co., Ltd
Construction address: No.1 Binzhong Road, Keqiao Economic and Technological Development Zone, Keqiao District, Shaoxing City (formerly the factory area of Dongfang Tea Technology Co., Ltd.)
Project nature: New construction
Construction content and scale: Shaoxing Changmu New Material Technology Co., Ltd. utilizes the existing vacant land and factory buildings of Zhejiang Dongfang Tea Industry Technology Co., Ltd. located at No. 1 Binzhong Road, Keqiao Economic and Technological Development Zone, with an area of about 8000 square meters, to purchase resin reaction kettle, dilution kettle, dispersion kettle and other equipment to form an annual production capacity of 20000 tons of air drying self crosslinking water-based resin and 4000 tons of water-based coating. The water-based coating project involves a physical dilution process and does not involve chemical synthesis reactions. The total investment of the project is 120 million yuan, including 100 million yuan of fixed assets investment. After the completion of the project, it is expected to sell 300 million yuan and generate a profit and tax of 20 million yuan.
2、 Distribution of major environmentally sensitive targets within the scope of environmental impact assessment
The water environment protection target involved in this project is the central river; The main atmospheric environmental protection targets involved are 5 administrative villages and 1 primary school within the evalsuation scope; evalsuate the silent environmental protection objectives within the scope.
3、 Prediction of major environmental impacts
1. Environmental air impact
According to the analysis of the prediction results, under normal operating conditions, the maximum concentration of the main pollutants emitted by the project, as well as the concentration and contribution values to each concerned point, can meet the corresponding environmental quality standards; After superimposing other ongoing projects and environmental background values, the maximum concentration of major pollutants emitted by the project and the concentration superposition values for each concerned point can meet the corresponding environmental quality standards. According to the analysis, there is no need to set an atmospheric environmental protection zone after the project implementation.
2. Impact on water environment
At present, there is no environmental capacity in the surrounding inland water bodies of this project. After the implementation of the construction project, the discharged wastewater will be treated by the Shaoxing sewage treatment plant and the tail water will be discharged into the sea, without directly discharging into nearby surface water and sea areas. Under normal circumstances, it will not have an impact on the inland water bodies of the park.
Strictly implementing the centralized collection of wastewater in the factory area, and ensuring the hardening and anti-seepage of the factory floor, especially for solid waste yards and easily polluted areas, can prevent groundwater pollution accidents from occurring at the source. Under normal operating conditions, the construction of this project has minimal impact on the groundwater environment.
3. Analysis of Acoustic Environmental Impact
The main source of project noise is intermittent noise. Under the premise of implementing sound insulation measures for pumps and fans in the enterprise, it is expected that the noise at the factory boundary can meet the requirements of Class 3 sound environment functional zones, and the impact on the surrounding environment is not significant.
4. Impact of solid waste
On the basis of strictly implementing the various solid waste disposal measures proposed in this environmental impact assessment, the solid waste of this project can be stored and properly disposed of in a standardized manner, basically achieving zero emissions, and will not have a significant impact on the surrounding environment.
5. Soil environmental impact
Enterprises should do a good job in hardening and anti-seepage of the factory floor, and carry out anti-seepage work on the ground of solid waste yards and easily polluted areas, which can prevent soil pollution accidents from the source.
4、 Main environmental protection measures to be taken, environmental risk prevention measures, and expected effects
The list of pollution prevention and control measures and expected effects after the implementation of this project is shown in Table 2.
Content type | Measure Name | Main Content | Expected governance effect |
exhaust gas | Process waste gas | ① The process waste gas is treated using the "water spray+photocatalytic oxidation+alkali solution spray" process ② The feeding dust is treated with bag dust removal. |
Standard emissions |
Tank exhaust gas | The storage tank is equipped with a breathing valve device, and the breathing exhaust gas from the storage tank is connected to the exhaust gas treatment device. | ||
Waste gas from wastewater treatment stations and solid waste storage facilities | The wastewater from the sewage station is collected with a lid, and the waste gas from the hazardous waste warehouse is collected using the "alkali spray+sodium hypochlorite spray" process for disposal. | ||
waste water | waste water | The wastewater is collected in a "wastewater collection tank+air flotation tank+hydrolysis acidification tank+MBR tank+clean water tank". handle | Standard emissions |
Sludge treatment system | Sludge thickening tank, plate and frame filter press, and supporting sludge pump, etc | ||
Groundwater and soil | ① The ground of the equipment area in the factory is hardened with concrete to prevent materials from running, emitting, dripping, or leaking during the process of technology and product loading and unloading from infiltrating the soil and causing pollution to the groundwater environment; ② The emergency sewage pool in the factory area is constructed with concrete and equipped with an anti-seepage layer to prevent sewage from infiltrating and polluting groundwater; ③ The material storage yard and temporary storage area within the factory are hardened with concrete to prevent contamination of groundwater, and are equipped with roofs and cofferdams to prevent secondary pollution caused by precipitation; ④ The sewage collection pipeline in the factory area adopts PVC pipeline for elevated transportation of sewage. |
Preventing groundwater and soil pollution | |
solid waste | industrial solid waste | Classify and collect, and set up a dedicated site for storage. The hazardous waste temporary storage facilities meet the requirements of GB18597-2001. The disposal of hazardous waste must be entrusted to qualified units; Outsourcing comprehensive utilization of general packaging materials. | |
domestic garbage | Collect and clean up sanitation. | ||
noise | Select equipment with local sound insulation, add sound insulation and noise reduction facilities to high noise equipment such as air compressors and compressors, and strengthen equipment maintenance. | ||
risk prevention |
① Develop an environmental risk emergency plan; ② Improve emergency facilities according to the emergency plan; ③ Carry out emergency drills and strengthen daily management; |
This project complies with the requirements of environmental functional zoning, main functional zone planning, overall land use planning, and urban-rural planning; According to the analysis, the pollutants emitted by the project after implementation comply with the national and provincial pollutant emission standards; The total amount of newly added pollutants emitted after project implementation needs to be addressed through regional balance substitution; The environmental impact caused by the implementation of the project meets the environmental quality requirements determined by the environmental functional zoning of the project locations; The project has a high level of clean production and meets the requirements of clean production principles; The risk prevention measures of this project meet the corresponding requirements, and the products, production processes, and equipment of this project comply with national and local industrial policy requirements.
Therefore, from an environmental perspective, the implementation of this project at the proposed site is feasible.
6、 Public access methods and deadlines
The environmental impact assessment report can be consulted at the office of the construction unit or environmental impact assessment unit, and supplementary information can be requested from the construction unit or environmental impact assessment unit if necessary.
Report review and request for supplementary information: April 14, 2020 to April 28, 2020.
7、 Scope and main issues for soliciting public opinions
The public participation in the environmental impact assessment of this project will solicit opinions and suggestions from citizens, legal persons, or representatives of other organizations within the scope of the project evalsuation. The main content of soliciting public opinions includes major environmental issues of public concern, the possible impact of project construction on the surrounding environment, and other opinions or suggestions on the environmental protection work of this project.
8、 The forms of soliciting public opinions and the main ways for the public to express their opinions
Publicity form: 1. On the website of Changmu (Ningbo) New Material Technology Co., Ltd., the parent company of the construction unit( https://www.sdzysb.com ), and commissioned by the enterprise on the website of Zhejiang Environment Co., Ltd( https://www.zjshjkj.com/ )Make public announcements; 2. Publicize on the bulletin board of the village (residential) committee within the scope of the environmental impact assessment area of the construction project.
The public can express their opinions and views on the construction and environmental impact assessment of the project by sending letters, faxes, emails, or making phones calls to the designated address.
Publicity period: April 14, 2020 to April 28, 2020.
Soliciting public opinions: April 14, 2020 to April 28, 2020.
The construction unit will truthfully record the opinions and suggestions of the public in the "Public Participation Explanation" of the project, and reflect the valuable opinions and suggestions of the public to the construction unit, design unit, and relevant departments of the project.
[Note]: Please provide detailed contact information as much as possible when the public expresses their opinions.
9、 Contact Information
1. Name and contact information of the construction unit
Construction unit: Shaoxing Changmu New Material Technology Co., Ltd
Contact person: Mr. Yu Contact phones number: 13777083555
2. Name and contact information of the environmental impact assessment unit
Environmental Impact Assessment Unit: Zhejiang Environmental Technology Co., Ltd
Address: Building 3, No. 199 Longxiang Street, Future Science and Technology City, Yuhang District, Hangzhou City
Contact person: Ma Gong Contact phones number: 0571-87992779
3. Contact information of the environmental impact assessment approval unit
Unit Name: Shaoxing Ecological Environment Bureau Contact Number: 0575-86604938
10、 The method and timing of full disclosure
Before submitting this project to the Shaoxing Ecological Environment Bureau for approval, the environmental impact assessment report of the project will be posted on the website of Zhejiang Environmental Science and Technology Co., Ltd( )Make the full text public.